A partnership proposal for CK Construction Group

Embraxis
Technologies

Agentic wearables that put an expert beside every CK superintendent, foreman, and project engineer, with project data and compute that never leave your systems

Safety · Excellence · Integrity · Build Greater

Embraxis stack: multimodal wearables, production infrastructure, and physical AI built on your data and hardware

VisionDeveloping a personalized alter-ego for your most valuable employees

Fit with CK

Safety & Excellence

  • Hands-free checklists and hazard prompts that keep eyes on the work
  • Do it right the first time: as-built conditions checked against the plans as work is done

Self-perform trades

  • Guided layout and installation for carpentry, concrete, drywall, and steel erection
  • Faster ramp-up for new craft professionals alongside your best foremen

BIM to field

  • Wearable capture ties field progress back to your BIM, 5D, and VDC models
  • Daily logs, punch lists, and RFIs drafted in minutes, not hours


Foundations Enterprise-grade bedrock for commercial construction

Security

  • Private VPC or on-premise deployment
  • Owner drawings, bid data, and site imagery stay in-house
  • Hardened model weights & strict RBAC

Governance

  • End-to-end data & model lineage tracking
  • Auditable safety, QA/QC, and closeout records
  • Deterministic validation & safety boundaries

On-premise

  • Runs on your own servers & edge devices
  • Integrates with your BIM/VDC and project tools
  • Validated on your active jobsites

Missions where we can help

Mission Who Est. rate How the wearable helps Time saved / day
Daily logs & field reports Superintendent $85–120/hr Voice-dictated logs, photo-tagged progress, look-ahead updates drafted automatically 1–1.5 h
Quality walks, punch lists & closeout Project engineer / QC manager $70–100/hr AR overlay of BIM against as-built, voice-to-punch-list with photos 1–1.5 h
RFIs & field-condition capture Project manager / VDC engineer $75–110/hr See-what-I-see capture with measurements, RFI drafted with photos and spec references 1–1.5 h
Safety inspections & JHA documentation Safety manager $65–90/hr Hands-free checklists, hazards flagged from the camera view, records logged automatically 0.75–1 h
Layout & verification for self-perform trades Foreman / lead craft professional $60–90/hr AR layout from the model, fewer tape-and-recheck walks, as-built capture 0.75–1.25 h

At these rates, about 1 hour saved per person per day is worth roughly $50–$200 of recovered labor per workday. Rates are loaded-cost assumptions and time savings are planning estimates, both to be validated in a pilot on CK’s own projects.

Partner with us

An agentic wearable layer for CK’s field teams

Where would an expert on every builder’s shoulder help CK most: self-performed trades, quality and closeout, or safety?

  • Set up a discovery call by phone or email.

  • We scope one use case and build a prototype in 3-4 months, on your hardware and data.

  • Outcome: your best builders’ expertise, available on every crew and every jobsite